The document describes the ongoing RCRA interim remedial measures program at the 3M Decatur site, focusing on the construction of a containment structure for an inactive landfill to mitigate groundwater contamination, with key components including a subsurface sheet-piling barrier and an upgraded multilayer cap to prevent precipitation infiltration.
|
2002 |
AR226-1700
|
o9aN2dGjkZo32z5JyRkYg0VxD |
1 |
|
The document describes the ongoing RCRA interim remedial measures program at the 3M Decatur site, focusing on the construction of a containment structure for an inactive landfill to mitigate groundwater contamination, with key components including a subsurface sheet-piling barrier and an upgrade to a multilayer cap to prevent precipitation infiltration.
|